Project Description
Design and construct electrical works to a challenging 5 month construction program. Power systems include redundancy, uninterruptible power supplies and N+1 backup generator systems. The project required precision heating, cooling and ventilation, allowing Metronode data centresto support high-power deployments. As a zero downtime facility, standards of construction were exacting and rigorous.
Power features:
- N+1 block redundant plant room design
- Dual busway power distribution throughout data halls
- 2000kVA continuously rated generators
- Onsite fuel storage for over 14 hours at full load with constant refill capability
Security
- Dual authentication access with iris scanning and proximity card access control
- 24 x 7 security camera recording and digital archiving
The project won the National Electrical and Communications Association (NECA) ACT Excellence award for best Medium Commercial project, 2016.