Project Description

Fredon was engaged to install the critical ventilation systems for the Reverse Osmosis building at the Desalination Plant at Kurnell.  The nature of the plant dictated particular requirements that our engineers had to adapt to, such as the need for marine grade aluminium and a unique site-specific design.  It is a good example of the adaptability required for specific industrial functions.